Interior Demolition
in Toronto & the GTA
Residential & Commercial
Interior Gut Outs
Condo & Office Strip-Outs
trusted by






















messy demolition can derail your Business
Unreliable Contractors: When you hire the wrong demolition crew, you’re left dealing with half-finished work, debris everywhere, and a chaotic site that’s unsafe for the next phase of construction.
Delays and Downtime: A poorly executed demolition can lead to structural damage, missed deadlines, and costly setbacks.
Dangerous Worksites: Without proper clean-up, you’re not only risking the safety of your team but also facing potential liability issues that could haunt you long after the demolition is done.
demolition done right the first time
Whether it’s tearing down walls or stripping out entire buildings, you need a team that not only does the job but does it with precision, care, and a commitment to leaving the site spotless
At Manpower Demoltion, we live by our trademarked slogan, “No Nail Left Behind.”
When we finish, the only thing left is a clean slate, ready for the next phase of your project.
How We Work
Kitchens & Bathrooms
Cabinets, countertops, tile, tubs and drywall come out, with the plumbing and electrical in the room shut off first so nothing live is left open.
Basements & Condos
Old framing, insulation, ceilings and flooring cleared so the space can be rebuilt or lowered. In a condo, we plan around the building’s rules for hours, elevators and debris.
Commercial Strip-Outs
Offices, stores and sales centres stripped back for the next fit-out. Partitions, drop ceilings, flooring and fixtures come out, and the space is handed back clean.
Certified & Insured
- Health and Safety for Workers
- Health and Safety for Supervisors
- Asbestos Awareness
- WHMIS
- Building Codes in Ontario
- Working at Heights
- Elevating Work Platform Training
- Fall Protection
- Workplace Violence and Harassment Prevention
- Forklift Operator Safety
- St. John Ambulance - Emergency First Aid - CPR C - AED
All certificates can be provided upon request
Why Choose Us
Unmatched Precision
We’re meticulous in every job, ensuring that your demolition is done right, with no damage to the structures that stay
Guaranteed Clean-Up
Our “No Nail Left Behind” promise means we don’t just demolish—we ensure the site is clean, safe, and ready for the next step
Flexible Scheduling
We work around your timeline to minimize disruption and keep your project moving forward on schedule
Interior Demolition in Toronto: What to Know Before the Walls Come Out
Interior demolition removes what’s inside a building and leaves the shell standing. The exterior walls, roof and foundation stay. The finishes, fixtures, partitions, ceilings and floors that the renovation replaces come out.
Manpower Demolition does interior demolition across Toronto and the GTA from our base in Vaughan. Homeowners, renovation contractors, builders, interior designers, architects and commercial owners bring us in for this stage. Most of our residential work is done by hand, which protects the parts of the building that stay and leaves less mess for the next trades.
Below: what the work includes, Toronto’s permit rules, asbestos and lead, how a job runs, and what changes the timeline and the cost.
What Interior Demolition Includes
Every job is scoped room by room. These are the usual items:
- Drywall and plaster walls, down to the studs or the masonry.
- Ceilings, including drop ceilings and their grids.
- Flooring: carpet, hardwood, tile, vinyl, self-levelling compound and subfloor.
- Kitchens: cabinets, countertops, backsplash and appliances.
- Bathrooms: tubs, showers, vanities, toilets and tile.
- Basement finishes: framing, insulation, drywall, flooring and ceilings.
- Built-ins, millwork, trim and doors.
- Commercial fit-outs: partitions, counters, drop ceilings, flooring and fixtures in offices, stores and sales centres.
Some work sits outside an interior strip-out. Load-bearing walls, beams and posts aren’t removed on assumption: they need a design and a building permit first. Taking the whole building down is complete demolition. Asbestos and other hazardous materials are removed before the strip-out, as a separate abatement step.
Interior, Selective or Complete Demolition?
People mix these terms up, and they do overlap. Interior demolition clears the inside of a building, from a single room to a full gut, and keeps the shell. Selective deconstruction takes out specific elements and protects what’s around them, such as one wall, a section of concrete or materials worth salvaging. It’s slower and more precise. Complete demolition takes the whole structure down and clears the site.
A kitchen renovation is interior work. If you’re keeping the hardwood and the staircase while the rest is gutted, the crew works selectively around them. A teardown for a new house is complete demolition.
Kitchens and Bathrooms
A kitchen usually comes out as cabinets, countertops, backsplash and appliances, and often the flooring and drywall behind them. Bathrooms may go down to the studs. Tile and mortar make bathroom debris heavy for the size of the room.
Plumbing and electrical in the room are shut off before removal starts, so nothing live is left open. If the new layout moves plumbing, that part of the renovation needs a permit in Toronto.
One of our Google reviews comes from a large kitchen renovation in Ancaster, where the design firm running the project brought our crew in for the demolition.
Basements
Basement demolition clears old framing, insulation, drywall, ceilings and flooring so the space can be rebuilt. It’s also the first step when a basement is being lowered. The finishes come out before underpinning can start.
Toronto doesn’t require a permit to finish a basement when the work has no structural changes, no new plumbing and no second unit. Underpinning, a new basement entrance, a second unit, new plumbing or structural changes all bring a permit into the project.
Older basements can hide asbestos in floor tiles, pipe insulation and drywall compound. A general contractor in the London area hired us to remove asbestos flooring so a basement could be converted into a legal unit.
Condos
A condo adds the building’s rules to the City’s. Before you book a start date, ask the property manager for the renovation rules: elevator bookings, permitted hours, protection for hallways and elevators, the route debris has to take out of the building, and any insurance documents the building needs.
We plan the work around those rules. One client we’ve worked with for more than ten years reviewed a condo job in a high-security building with noise restrictions, where our crew removed the subfloor, self-levelling compound and drywall and sent updates every day.
Commercial Strip-Outs
Commercial interior demolition clears offices, stores and other units for a new tenant or a new design. Partitions, drop ceilings, flooring, millwork and fixtures come out, and the space is handed back clean for the fit-out crew.
Two examples from our customers’ reviews: a 3,400 sq ft sales centre gutted in three days, and a top-to-bottom gut at the old Muddy Duck in Mississauga, finished in the seven days we promised.
In a commercial building the owner should have a list of designated substances ready before the work is tendered. The asbestos section below explains why.
Do You Need a Permit for Interior Demolition in Toronto?
It depends on what comes out and what goes back in. Toronto Building’s list of projects that need a building permit includes:
- Structural or material alterations, which the City’s list describes as “adding or removing walls (i.e., changing room sizes and/or uses)”.
- Installing or changing heating or plumbing systems.
- Finishing a basement when the work includes structural changes, new plumbing, underpinning, a basement entrance or a second unit.
- Changing a building’s use, for example from a home to an office, even when no construction is planned.
The same page lists work that doesn’t need a permit, including replacing plumbing fixtures, installing cabinetry and millwork, adding or replacing insulation, and finishing a basement without the items above. Zoning rules still apply either way.
The City’s wall item doesn’t say “load-bearing”. If you plan to remove or move a wall, check with Toronto Building before it comes down. The owner is responsible for permits, and the City warns that missing ones can lead to delays, legal action or removing work that’s already done.
Mississauga, Brampton, Vaughan and the other GTA municipalities run their own building departments. Our Toronto demolition permit guide covers the City’s demolition permit in detail.
Asbestos, Lead and Other Hidden Materials
Older interiors can hide materials that have to be dealt with before demolition. Ontario’s guide to the asbestos regulation, O. Reg. 278/05, lists sprayed-on insulation and fireproofing, pipe and boiler insulation, ceiling and floor tiles, and drywall compound among the asbestos products found on demolition projects.
What Ontario’s rules say:
- Section 30 of the Occupational Health and Safety Act requires the owner of a project to list the designated substances present, including asbestos, before tendering the work and to give that list to everyone bidding. Ontario’s guide says this applies to owners of residential properties who take on projects.
- Asbestos-containing material that demolition may disturb has to be removed, as far as practicable, before the demolition starts or continues.
- O. Reg. 278/05 doesn’t apply to the owner of a home they live in, but it does apply to the contractors and workers doing the job.
Lead is the other common one. Health Canada says a home built before 1960 probably contains lead-based paint, and one built between 1960 and 1990 may have it outside and in smaller amounts inside. Sanders, heat guns and torches should never be used on it.
If testing finds asbestos, it’s removed first. We coordinate that as part of the project through our abatement service, and the strip-out follows.
Before a Wall Comes Out
A wall that looks like a plain partition can still hold up the floor above or carry pipes and wires.
If there’s any doubt about whether it’s structural, a qualified designer or engineer confirms it. A structural wall needs a design, temporary support and a building permit before it comes out.
Check what runs through it too: wiring, water supply and drain lines, vents, ductwork, and sometimes gas. Licensed trades shut these off and cap them before demolition reaches them.
How an Interior Demolition Job Runs
- You send the scope through our form or by phone, with drawings if you have them.
- We visit the site, review your documents and agree with you on what stays: floors you’re keeping, a staircase, cabinets going back in.
- You get a detailed estimate, usually within 24 to 48 hours of the visit.
- Protection goes up. The work area is closed off from the rest of the space, and floors are covered along the route debris takes out.
- Electrical, plumbing, gas and ventilation in the work area are isolated by the right trades.
- Fixtures, doors, trim and anything being reused come out first.
- The strip-out works from the top down, ceilings before walls and walls before floors. Residential work is mostly done by hand.
- Debris is hauled away as the work goes.
- The space is cleaned and handed over ready for the next trade, under our No Nail Left Behind™ standard.
Debris: Bins, Permits and Drop-Off Depots
We haul the debris away as part of the job. If you’re arranging a bin yourself, a few Toronto rules apply:
- A disposal bin, or a bin with a drop chute, on the boulevard, sidewalk, road or a public lane needs a Street Occupation Permit. It’s issued in person and charged by the day.
- That permit covers the area beyond your property line, so a bin on your own driveway doesn’t need one.
- For smaller loads, the City’s drop-off depots take renovation waste. Some accept clean drywall up to one tonne and others take no drywall, and you pay a deposit before unloading. Our Toronto drop-off depots guide lists them.
Living or Working in the Space During the Work
You don’t always have to move out. Living without one bathroom during a strip-out is usually manageable. A full gut that takes the kitchen and every bathroom at once is much harder to live with.
Toronto’s noise bylaw allows construction noise from 7 a.m. to 7 p.m. on weekdays and from 9 a.m. to 7 p.m. on Saturdays. It’s not allowed on Sundays or statutory holidays. A condo or commercial building may set tighter hours of its own, and the schedule follows those.
For a business that stays open, agree with the landlord or property manager on hours, entrances and the debris route before the start date.
How Long Interior Demolition Takes
A selective interior gut often takes one to four days on site. Larger commercial spaces take longer, though not always by much: one customer’s 3,400 sq ft sales centre was gutted in three days, and the Muddy Duck gut took the seven days we’d promised.
These things stretch the timeline:
- Asbestos or lead found before or during the work.
- A permit, if walls, plumbing or the use of the space are changing.
- Access: stairs, elevator bookings, long carries to the bin and downtown parking.
- Building hours in condos and commercial buildings.
- Surprises behind the walls, such as services that aren’t on any drawing.
What Drives the Cost
Every interior job is priced after a site visit, because two jobs of the same size can differ a lot. The estimate depends on:
- How much comes out, and how many layers there are, such as new tile laid over old.
- The materials. Plaster and tile take longer than drywall and carpet.
- How much stays and needs protecting.
- Access: floors, elevators and the distance to the bin.
- The volume of debris and its disposal.
- Asbestos or lead testing and removal.
- Building rules on hours, elevator bookings and protection.
- Permits or engineering for any structural change.
Mistakes to Avoid
- Taking out a wall before checking whether it’s structural and whether it needs a permit.
- Starting before anyone has checked for asbestos in an older building.
- Leaving services live. Wiring, water and gas need to be shut off and capped first.
- Demolishing before the new design is final, then paying to rebuild something that could have stayed.
- Leaving the condo’s rules until the crew is at the loading dock.
- Choosing on price alone without asking how the debris leaves the building and who cleans up.
Interior Demolition Across the GTA
We do interior demolition across Toronto and the GTA, including Mississauga, Brampton, Vaughan, Oakville, Milton, Ajax and Scarborough. Each municipality runs its own building department, so permit steps change from city to city. Our pages for Toronto, Mississauga and Oakville cover the local details.
Interior Demolition Questions
What does interior demolition include?
It removes what’s inside a building while the shell stays: walls and ceilings down to the studs, flooring and subfloor, kitchens, bathrooms, built-ins and commercial fit-outs. Structural members come out only with a design and a permit.
Do I need a permit for interior demolition in Toronto?
Toronto requires a building permit for structural or material alterations, including adding or removing walls that change room sizes or uses, for installing or changing plumbing or heating, and for a change of use. Replacing plumbing fixtures and installing cabinets don’t need one. Check with Toronto Building before you remove any wall.
How long does interior demolition take?
A selective interior gut often takes one to four days on site. Asbestos, permits, access and building hours can stretch that.
Can interior demolition be done in an occupied condo?
Yes, within the building’s rules. Ask the property manager about elevator bookings, work hours and protection for common areas before you set a start date.
Do you remove asbestos before demolition?
Yes. If testing finds asbestos, it’s removed first through our abatement service, and the strip-out follows. In Ontario, asbestos that demolition may disturb has to be removed, as far as practicable, before the work starts.
Can a load-bearing wall be removed?
Yes, but not on assumption. It needs a design from a qualified designer or engineer, temporary support and a building permit before it comes out.
Do you take the debris away?
Yes. Debris is hauled away as part of the job, and the space is left clean for the next trade.
Do I need a permit for a bin on the street in Toronto?
Yes, if the bin sits on the boulevard, sidewalk, road or a public lane. That’s a Street Occupation Permit, issued in person and charged by the day. A bin on your own driveway doesn’t need one.
What’s the difference between interior and selective demolition?
Interior demolition clears the inside of a building. Selective deconstruction removes specific elements and protects what’s around them. A renovation can use both.
Do you work with contractors and designers?
Yes. Renovation contractors, builders, interior designers and architects bring us in for the demolition stage of their projects.
How quickly can I get an estimate?
Usually within 24 to 48 hours after we assess the site. Send the scope through the form or call (905) 597-8333.
latest reviews
“Reached out to manpower demo for what I thought was an impossible project, and these guys blew my socks off. The office was an absolute treat to deal with, and the team on the field went over the top to ensure my project was completed without any problems. Highly recommend these guys”
– Don, Toronto
“We are blown away by the professionalism and fast turnaround Manpower Demolition has delivered. In just 3 days, they managed to completely gut our 3400 sq ft sales center along with the removal of arches we had outside at the front. Best demolition work we have ever seen”
– Dmalfara, Etobicoke
“They were in and out in 4 days and the place looks great and perfect for the next trades. I have had 2 contractors in since demo and there were so impressed with the demo they ask me for the contact info for Manpower… they were super impressed with the quality Manpower delivered.”
– Jason, Toronto
“Manpower exceeded my expectations! I had selective demolition throughout the home. They do not miss a nail or screw. These guys will be my go-to from now on. They are fast and efficient, and work was done on time, and the worksite was left spotless”
– Morey, Vaughan
“We have used Manpower MANY Times! We couldn’t believe that they trademarked “no nail left behind,” but these crews didn’t mess around. Between every nail pulled, swept, and shop vac’ed. This demo company legitimately left it cleaner than most of the trades we have had on sites.”
– John, Orangeville
“First time using manpower demolition. Very pleased with the skill and size of crew. The job was broom-swept and vacuumed and completed in just over a half day. Great coordination and follow-through. Would highly recommend it to other GCs and contractors.”
– Alex, Toronto
“I am a GC in the London area and my team ran into some asbestos flooring that we needed removed in order to convert the basement to a legal unit. I reached out to Fernando on instagram and he responded immediately. What a pleasure it was working with them.”
– Kayle, London
“Congratulations, Fernando. On an amazing business, you have grown and continue to grow. Jen, thanks for the quick responses and no hesitation to answer any questions I have had. I have now chosen ManPower to do all my demolition work for my bathroom renovations”
– Greg, Toronto
“I hired manpower demolition for a selective demolition of two bathrooms and a partial master bedroom and the manpower team was very thorough no nails left and all cleaned up. I would definitely have them on any future work.”
– Bill, Toronto
“We hired ManPower demolition for a top to bottom gut at the old Muddy Duck in mississauga we were promised a seven day demolition and let me tell you they delivered clean and professional. Just like to thank the whole team you guys crushed it.”
– Nikos, Mississauga
“Manpower is my go to demolition team. They show up when their supposed to, finish when they say and leave the jobsite ready for my next crews to come in. From Start to finish Fernando, Justin and Danny and the rest of the guys provide you with top notch workmanship and customer service.”
– Mark, Toronto
“By far, the most painless demo experience we could have had as homeowners renovating our house. So impressed with this crew and their professionalism, punctuality efficiency, and especially their cleanup! Exceeded our expectations in every way!”
– Robert, Toronto
our founder
With over 20 years of experience in the demolition industry, Fernando Morales has established himself as a visionary leader and innovator.
As the owner and operator of Manpower Demolition, Fernando has revolutionized the way demolition projects are executed, setting new standards for safety, cleanliness, and efficiency.
Fernando’s biggest achievement has been transforming traditional demolition practices to ensure they are performed safely and efficiently, surpassing industry norms.
His dedication to excellence and innovation has positioned Manpower Demolition as a leading company in North America, known for its reliability and superior service.
areas we serve
CA Locations
- Toronto, ON
- Mississauga, ON
- Vaughan, ON
- Barrie, ON
- Hamilton, ON
- London, ON
- Kitchener, ON
- Waterloo, ON
- Niagara Falls, ON
- Ottawa, ON
- Kingston, ON
- Muskoka, ON
- Peterborough, ON
- Sudbury, ON
US Locations
- Naples, FL
- Fort Lauderdale, FL
- Jacksonville, FL
- Miami, FL
- Tampa, FL
- Orlando, FL
- Pompano beach, FL
- Fort Lauderdale, FL
- Hollywood, FL
- West Palm Beach, FL
- Boca Raton, FL
- Naples, FL
Franchising Available
work with us
Submit a form
Submit a form or call us and we will contact you ASAP to learn more about your project and needs
Site Visit/Documents
One of our project managers will visit your site and asses your project’s documentation
Get a free quote
Receive estimate
In 24-48 hours after we complete our assessment, we will provide you with a detailed estimate
We get to work
Once all paperwork is completed, our crew will get to the site on the agreed date